Installation: Introduction
You should set aside about ten hours for the whole installation project. The first and second steps will take about an hour. Burying the wire will take about four hours (if you use a trencher or edger. Doing the driveway will take an hour. And if everything goes according to plan the final connection and testing will take another hour. (The extra three hours is for the unexpected challenges and the much needed breaks that accompany any DIY task)